Skip to content

Pharma

GDP lanes with the paperwork already done.

For 2–8 °C and controlled room temperature lanes, Waypoint keeps calibrated readings, computes mean kinetic temperature for every shipment and records who acknowledged what, with a reason. The validation pack is ready before the inspector asks.

25400 MM1234LOGGER · 2–8 °CSHIPPER · A–AINSULATIONVIP 25 mmPACKSPCM +5 °CHOLD TIME96 h

Arden Health is a composite of the pharma wholesalers on Waypoint. Their lanes, their audits, their numbers.

AHThe fleet on this pageArden Health LogisticsLeeds and Manchester

38

vans, 2–8 °C

12

reefers, 2–8 °C and CRT

229

pharmacies and hospitals

54

calibrated probes

The inspector's two questions, answered on one screen.

Is the transport system validated? Was this shipment fit to release? The register on the left answers the first; mean kinetic temperature on the right answers the second.

GDP validation pack

Arden Health · transport system AH‑TS‑02

Approved

6 / 7

  1. 01User requirements (URS)AH‑VAL‑001ApprovedTW
  2. 02Supplier assessment, WaypointAH‑VAL‑002ApprovedTW
  3. 03Installation qualification (IQ)AH‑VAL‑010ApprovedRK
  4. 04Operational qualification (OQ)AH‑VAL‑011ApprovedRK
  5. 05Temperature mapping, 12 reefersAH‑MAP‑004ApprovedSN
  6. 06Performance qualification, summerAH‑VAL‑012In progressSN
  7. 07SOP: excursion handling and releaseAH‑SOP‑031ApprovedTW
Templates for every document ship with Enterprise; Waypoint's own change control summary is updated each release.

Shipment 77‑0412 · 72 h, one excursion

MKT 5.5°2°8°0 h24 h48 h72 h

MKT

5.5 °C

Out of range

120 min

Release with report

Who did what, when and why, signed.

Alarms, rule changes, releases and exports are kept unaltered for seven years, each with a person, a reason and an e-signature.

Audit trail · lane LDS‑MAN, today

Audit trail entries
TimeWhoWhatReasonSigned
14:31:08MBMarcus BellAcknowledged alarmTR‑2087 rear zone, 8.3 °CDoor not latched at Ashby, closede-signed
14:29:40WPSystemRaised alarmTR‑2087 rear zone above 8 °CRule: GDP 2–8 °C, delay 5 minauto
13:12:02SNSana NadeemChanged ruleCRT lane, delay 15 → 10 minSummer PQ protocol, section 4.2e-signed
12:47:55TWTomasz WierzbickiReleased shipmentOrder 77‑0412, MKT 5.4 °CExcursion within stability datae-signed
11:05:19RKRhys KendallExported recordTrip 2025‑0311‑08, PDFCustomer QA requeste-signed
09:58:33SNSana NadeemReplaced probeWP‑S1 #4478 → #5120Calibration due, certificate attachede-signed
08:14:47TWTomasz WierzbickiExported audit trailLane LDS‑MAN, last 90 daysSelf-inspectione-signed

0 h

To close an excursion investigation, down from three days

With MKT and the audit trail on the record

0%

Of shipments with mean kinetic temperature on the record

Computed per trip, per probe

0 findings

On transport at the last GDP inspection

Arden Health, 2025

VELDEN PHARMA

Result

Audit prep 3 days → 10 min

“Our GDP auditor asked for the temperature history of one shipment from March. I sent her the PDF from the trip page while she was still on the call.”
TWTomasz WierzbickiHead of Quality, Velden PharmaRead the story

Templates for URS, IQ, OQ and PQ, the supplier assessment, our software development and change control summary, and support for your temperature mapping study. Enterprise customers get a named validation engineer.

Run one GDP lane on Waypoint for 30 days.

We calibrate the probes, map one reefer with you and hand your QA team the validation templates on day one.

Pilot hardware is yours if you stay, free to return if not

052° · 8.1 MI097° · 6.4 MI037° · 9.0 MIETA 15:48NORTHGATE DCWP1WP2WP3BN5 MI